Milestones

Changed:
<
<
>
>
Year Month Milestone
2003 November S. F. Novaes, E. M. Gregores: “Thematic Project” approved by FAPESP
Procurement processes for buying hardware starts
2004 January Installation of physical infrastructure starts at University of São Paulo
March “Phase I” deployed: SPRACE starts processing D0 jobs
September One million MC events processed for D0 collaboration
November SC´04 record of data transmission (~ 2 Gbps)
2005 March 3.5 million MC events & 1 TB of data generated for D0
June "Phase II” deployed: 115 cores & 12 TB storage
July US Open Science Grid (OSG) comes to live
August SPRACE signs membership with OSG
2006 New WDM channel (ANSP): SPRACE @ 1 Gbps
SPRACE starts processing jobs for CMS VO of OSG
September “Phase III” deployed: 180 cores & 12 TB disk
2007 New sysadmins for SPRACE starts
Discussion (ANSP) to deploy a CA for the State of São Paulo
New UNESP campus connected to MetroSampa network
2008 March SPRACE domain: from “if.usp.br” to “sprace.org.br”
September LHC first beam
October New Thematic approved
November NCC is officially created
2009 January Construction of NCC datacenter at new UNESP campus starts
April FAPESP signs MoU with WLCG: BR-SP-SPRACE is now official
SPRACE cluster transferred from USP to UNESP (~ 5 tons in 32 hours)
September Inauguration of NCC datacenter and GridUnesp infrastructure
November SC´09 in Portland: new record of data transmission (~8.8 Gbps)
2010 January New router (FAPESP): NCC connected to KyaTera & MetroSampa
August SPRACE “Phase IV” deployed: 200 TB of storage
New amplifiers (Padtec) on Kyatera network: 10 Gbps from NCC-ANSP
December São Paulo OSG School: 5 experts from US: 30+ participants
2011 KyaTera network at NCC in production: 10G (commodity) + 10G (R&D)
March GridUNESP presented at OSG-AHM´11 (Harvard Univ.)
Partnership Intel: development of cloud at the Secretary of Education
2012 May NCC Workshop for training system administrators in HPC
June SPRACE “Phase V” deployed: ~850 TB storage (1 PB raw)
August IGTF approves ANSP Grid CA
November SC´12: SPRACE-Padtec-Caltech demonstration of 100G link
2013 July NCC server used at INFIERI Summer School (Oxford)
August NCC/SP and COPPE/RJ:“Intel Software Conference”
November SC´13: OpenFlow exercise & new demo with Padtec
2014 July NCC server used at the second INFIERI Summer School (Paris)
August NCC selected as a Intel Parallel Computing Center (IPCC)
November SC´14 demonstration

Revision 52007-02-07 - SergioNovaes

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Milestones

Line: 8 to 8
 
07/Nov/2006 Third upgrade of the cluster installed: 242 processors total
15/Jan/2007 SAMGrid abandoned. DZero MC production starts to be done through OSG.
18/Jan/2007 FTS, SRM, Gratia implemented .
Changed:
<
<
XX/Jan/2007 SPRACE certified as a DZero Reprocessing site .
XX/Jan/2007 Start of DZero Reprocessing .
>
>
02/Feb/2007 SPRACE certified as a DZero Reprocessing site .
06/Feb/2007 Start of DZero Reprocessing .
 
XX/Jan/2007 Implementation of distributed storage system .
XX/XXX/2007 Connection (1+1) Gbps SPRACE-NAP do Brasil in production .
XX/XXX/2008 SPRACE Link upgrade to 10 Gbps .

Revision 42007-01-20 - SergioNovaes

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Milestones

Date Milestones
Changed:
<
<
01/Oct/2006 Direct and non-shared 1 Gbps connection SPRACE-NAP do Brasil using CWDM operational: 5 hops to Abilene and 163 ms to Femilab
>
>
01/Oct/2006 Direct and non-shared 1 Gbps connection SPRACE-NAP do Brasil using CWDM operational: 5 hops to Abilene and 163 ms to Fermilab
 
24/Oct/2006 Experimental extra 1 Gbps connection SPRACE-NAP do Brasil
Deleted:
<
<
31/Oct/2006 New 1 Gbps SPRACE-NAP link
 
07/Nov/2006 Third upgrade of the cluster installed: 242 processors total
15/Jan/2007 SAMGrid abandoned. DZero MC production starts to be done through OSG.
18/Jan/2007 FTS, SRM, Gratia implemented .

Revision 32007-01-20 - SergioNovaes

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Milestones

Date Milestones
Changed:
<
<
31/Oct/2006 New 1 Gbps SPRACE-NAP link using CWDM operational: 5 hops to Abilene and 163 ms to Femilab
07/Nov/2006 Third upgrade of the cluster installed
>
>
01/Oct/2006 Direct and non-shared 1 Gbps connection SPRACE-NAP do Brasil using CWDM operational: 5 hops to Abilene and 163 ms to Femilab
24/Oct/2006 Experimental extra 1 Gbps connection SPRACE-NAP do Brasil
31/Oct/2006 New 1 Gbps SPRACE-NAP link
07/Nov/2006 Third upgrade of the cluster installed: 242 processors total
15/Jan/2007 SAMGrid abandoned. DZero MC production starts to be done through OSG.
18/Jan/2007 FTS, SRM, Gratia implemented .
XX/Jan/2007 SPRACE certified as a DZero Reprocessing site .
XX/Jan/2007 Start of DZero Reprocessing .
XX/Jan/2007 Implementation of distributed storage system .
XX/XXX/2007 Connection (1+1) Gbps SPRACE-NAP do Brasil in production .
XX/XXX/2008 SPRACE Link upgrade to 10 Gbps .
 

Revision 22006-11-08 - SergioNovaes

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Milestones

Date Milestones
31/Oct/2006 New 1 Gbps SPRACE-NAP link using CWDM operational: 5 hops to Abilene and 163 ms to Femilab
Added:
>
>
07/Nov/2006 Third upgrade of the cluster installed
 

Revision 12006-11-01 - SergioNovaes

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

Milestones

Date Milestones
31/Oct/2006 New 1 Gbps SPRACE-NAP link using CWDM operational: 5 hops to Abilene and 163 ms to Femilab

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback

antalya escort bursa escort eskisehir escort istanbul escort izmir escort